Al Lesaily School

Al Lisaili, Dubai, United Arab Emirates
Visualization © UPA Italia by Paolo Lettieri Architects
Visualization © UPA Italia by Paolo Lettieri Architects
Visualization © UPA Italia by Paolo Lettieri Architects
Visualization © UPA Italia by Paolo Lettieri Architects
Visualization © UPA Italia by Paolo Lettieri Architects
Visualization © UPA Italia by Paolo Lettieri Architects
Visualization © UPA Italia by Paolo Lettieri Architects
Visualization © UPA Italia by Paolo Lettieri Architects
Site plan
Drawing © UPA Italia by Paolo Lettieri Architects
Ground floor plan
Drawing © UPA Italia by Paolo Lettieri Architects
First floor plan
Drawing © UPA Italia by Paolo Lettieri Architects
Elevations
Drawing © UPA Italia by Paolo Lettieri Architects
Sections
Drawing © UPA Italia by Paolo Lettieri Architects
Drawing © UPA Italia by Paolo Lettieri Architects
Drawing © UPA Italia by Paolo Lettieri Architects
Drawing © UPA Italia by Paolo Lettieri Architects
Drawing © UPA Italia by Paolo Lettieri Architects
Drawing © UPA Italia by Paolo Lettieri Architects
Drawing © UPA Italia by Paolo Lettieri Architects
Architects
UPA Italia by Paolo Lettieri Architects
Location
Saih Al Salam Street, Al Lisaili, Dubai, United Arab Emirates
Year
2021
Client
MOID

Al Lisaili in Dubai is the first public school developed in BIM - Building Information Modeling - by MOID, the Ministry of Infrastructure and Development of UAE.

The layout derives by prototype project for Schools for UAE developed by UPA Italia by Paolo Lettieri Architects and UPA in JV with General Planning in 2009. The original project of School for C1 Cycle was developed for 1000 students. MOID built several of these across all UAE. In 2016 MOID decided to update the design of the school prototype including a small kindergarten and other functions for special needs students. The Minister himself wanted the project to be the first one designed in BIM.

The implementation of the functions and the introduction of a new technology for the design also favored the renewal of the prototype design of the prototype. The new façade is based on a 1.5 m module which guarantees the typical modularity of a rational design in BIM. The various windows are composed following the new internal distribution and allowing a new compositional freedom.

Related Projects

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Housing and Kindergarten Fontanastrasse
    GERNER GERNER PLUS
  • GOLD - Housing Goldberg
    GERNER GERNER PLUS
  • BENE - Housing Benedikt
    GERNER GERNER PLUS
  • PUCH - Housing Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Other Projects by UPA Italia by Paolo Lettieri Architects

Abu Dhabi Ladies Club
Abu Dhabi, United Arab Emirates
Tamreem Clinic
United Arab Emirates
High School C3 – Campus
Sharjah, Fujairah, Rak, United Arab Emirates
St. Joseph's School
Abu Dhabi, United Arab Emirates
Al Qassimi Maternity Hospital
Sharjah, United Arab Emirates